X-Odessa is going better, yesterday we were 3rd in compensated, what is a great achievement for XP-50 in an up/down race in a fleet of Swans 42 and DK 46. This is thanks to the team, and a big job that have been made with a boat in two years of the project.

YCB was deeply involved in this XP-50 modifications. Among other jobs we has upgraded an electronic lately and we are still working on a fine adjustment of datas. Upgrade was made without replacing MFDs and instruments, just adding a processor, whis is cost effective and worked well.
- Managed a significant keel modification on a yacht construction stage, making a boat 1.5 tonnes lighter without sacrificing stability
- Made a cost-effective electronic upgrade, from a cruising mix of Raymarine and Garmin to the A&T-based powerful system. With an Expedition for the proper adjustments and navigation.
- Now we integrate the Cyclope load sensor for better control of the rig.

Next job for YCB on X-Odessa is to produce a custom carbon bowsprit, carbon flooring and doors for the weight saving